翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Yangshan Deep-Water Port : ウィキペディア英語版
Yangshan Port

Yangshan Port (Chinese: , p ''Yángshān Gǎng''), formally the Yangshan Deep-Water Port (, p ''Yángshān Shēnshuǐ Gǎng''), is a deep water port for container ships in Hangzhou Bay south of Shanghai. Connected to Shanghai's Pudong New Area by the Donghai Bridge and forming part of the Port of Shanghai, the islands of Greater and Lesser Yangshan are administered separately as part of Zhejiang's Shengsi County.
Built to allow the Port of Shanghai to grow despite shallow waters near the shore, it allows berths with depths of up to to be built, and can handle today's largest container ships. The port is built on the islands of Greater and Lesser Yangshan, part of the Zhoushan archipelago, with fill from land reclamation.
It is connected to the mainland via the Donghai Bridge, opened on 1 December 2005 as the world's longest sea bridge. The six-lane highway bridge took 6,000 workers two and half years to construct.
In mid-2011, port officials said the port was on track to move 12.3 million TEUs during the year, up from 10.1 million TEUs in 2010.
==Construction phases==
In 2000 and 2001, the decision was made to commence construction on the first of four phases. The first two phases have nine berths in total along a quayside. The first phase, which opened in 2004, can accommodate 2.2 million containers annually and includes 10 quay cranes. The second phase was opened in December 2006, and comprises with 15 quay cranes. The third phase, opened in stages, was completed in 2010 with seven berths.
The fourth phase, expected to open in 2015, will add 4 million TEUs to the port's annual capacity.〔
The total cost of building the port may reach US$12 billion over 20 years.〔()〕
When complete, the port will have 30 berths capable of handling 15 million TEUs annually.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Yangshan Port」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.